Poole Library | Poole
Project Description
Following discovery of RAAC panels on the library building in Poole, the property owner decided that they would need to be removed and replaced.
The project challenges largely come from working on a large building alongside many other parties, including members of the public, a library and a highway.
The building has been protected using a large temporary roof structure, designed around many fragile or unknown structures to give the protection needed whilst the RAAC panels are removed.
A New Lease of Life
Spetisbury Construction worked with the project engineers and surveyors to develop a replacement roof using metal decking laid on new steel purlins supported by the retained structure. The roof build-up was straightforward in principle. The main design challenge was working out how to support and connect the new steelwork to the older building.
Beneath the roof our team have been working with specialist subcontractors and the Employers M & E consultant to design and co-ordinate a new mechanical heating, cooling and ventilation system. We will be reinstating the pre-existing walls and providing new wall and floor finishes to give the building a new lease of life.
The project commenced following almost 10 months in the planning phase.
After the scaffolding structure and covering was applied
Break-out of the existing roof coverings.
Video | Click to view drone footage of Poole Library roof scaffolding