Kingston Maurward College, Suite

This project involved refurbishing an existing conference suite and toilet facilities. The suite was booked most weekends of the year for weddings; so it was challenging for the college to book the suite out for a six week duration to carry out the works. This was pre-booked and the project was completed within the tight timescales allowed.

Existing Crittall windows were removed to allow for the installation of a large aluminium screen providing a new entrance to the suite. And the partial infill of curtain walling to the side elevation to form a circular feature window. A vaulted ceiling was installed creating panels for the installation of modern chandeliers, which also provided a service void for the installation of air conditioning which the suite did not have previously.