Education
Mountbatten School, PBed Office
The project was to construct a new Personal Best Education Sports office.
This was to be constructed from a steel frame with a concrete power floated floor to the ground floor and a power floated concrete floor on a metal deck to the first floor. The external walls were constructed from masonry with the facing brick selected to match the adjacent building. Above that the building was clad with composite panels and a composite sheet roof.